7 m³ Truck Mixer Model: MXT712

tarak miksar nam
MXT712 madel
abead koli
6580 (mm) tul
2400 (mm) arz
2950 (mm) ertafa
7000 (Lit) zarfit bargiri batan amadeh
12000 (Lit) hojam koli dig
4000 (Lit) ghablit dig baraye hamel mosaleh khshk
59 (%) darsad bargiri
0~14 (rpm) sarat gardash dig dar daghigheh
16 (deg) zavbeh dig ba afegh
600 (Lit) zarfit tanker ab
2 taedad rolik
4 silander (Deutz F4L912 : madel) motor
ZF4300 girbx
sari 22 cpehydro pomp
sari 22 cpehydro motor
dard avil koler (khank konandeh roghen)
5 (mm) St37 jens ve zakhamet vargh cpehei mokhzan
5 (mm) St37 jens ve zakhamet pareh cpehei mokhzan
8 (mm) St37 jens ve zakhamet adasi mokhzan

Show more
1,846 / 5,000

< /tr>

Series

Track Mixer name
MXT712 Model
overall dimensions
6580 (mm) Length
2400 (mm)

Width
2950 (mm)

< td>Height

7000 (Lit) Ready-mix concrete loading capacity
12000 (Lit) Total volume of the boiler
4000 (Lit) Boiler capacity for transporting dry materials
59 (%) Percentage Loading
0~14 (rpm) Boiler rotation speed per minute
16 (deg) Boiler flue with horizon
600 (Lit) Water Tanker Capacity
2< /span> Number of rollers
4 cylinders (Deutz F4L912 : Model) Engine
ZF4300 Gearbox< /td>
Series 22 Hydro Pump
22 Hydromotor
Has Oil cooler (cooling) oil)
5 (mm) St37 Material and thickness of tank sheets
5 (mm) St37 Material and thickness of tank fins
< span dir="ltr">8 (mm) St37 Material and thickness of the tank lens
Category:

The truck mixer is used to transport concrete from the batching plant to the project site and consists of a truck and a mixer mounted on it.

Truck mixers are usually divided into two groups, some of them are used only for transporting ready-mixed concrete, and some others also perform mixing operations in addition to transportation operations, in which case certain amounts of materials and water are poured into the truck mixer and the mixing operation takes place during transportation.

It should be noted that truck mixers should generally not be too far from the factory site so that the mixed concrete can be used easily and as soon as possible.

In cases where the concrete transport time is long or there is a possibility of heavy traffic, it is better to transport the concrete dry and add the required water to other materials at the project site because if the ready-mixed concrete remains in the truck mixer for a long time, it hardens and can no longer be used.

Truck mixers are widely used in construction sites, road construction, bridge construction, dam construction, urban development, etc.